SPACECAPEXSpaceCAPEX

Space-industry tracker

Home / Q-Reports / Markets
Q-Report · 9M 2026

Avio Q3 2026: nine-month revenue up 16.7%, but backlog slips below guidance

Revenue is growing at double digits and the Virginia plant has broken ground. But the backlog is shrinking, and cash rose only thanks to Advent. The fourth quarter has a lot of work to do.

Q-Report9M 2026AvioAVIOReported Next report: · Q4 and full-year 2026
Revenue (9M)409.7EUR m +17% y/yYear earlier: 351.0
EBITDA margin (reported)4.4% +0.1 pp y/yYear earlier: 4.3%
Order backlog (vs 31 Dec 2025)1,993EUR m −8% y/yYear earlier: 2,166
Net financial position (vs 31 Dec 2025)614.5EUR m +3.8% y/yYear earlier: 591.7
Revenue by quarter, EUR m
Guidance
2026 revenue€560–590m
2026 reported EBITDA€27–35m
2026 adjusted EBITDA€29–37m
2026 net income€8–13m
Order backlog, end-2026€2,000–2,100m
9-month revenue vs guidance409.7 EUR m0Guidance: 560–590
All metrics · 9M 2026
Metric9M 2026Year earlierChange
Revenue (9M)409.7351.0+17%
EBITDA margin (reported)4.4%4.3%+0.1 pp
Order backlog (vs 31 Dec 2025)1,9932,166−8%
Net financial position (vs 31 Dec 2025)614.5591.7+3.8%
Reported EBITDA17.915.2+18%
Adjusted EBITDA18.616.4+13%
Reported EBIT1.70.2+750%
Adjusted EBIT2.31.4+68%

Amounts in EUR m. Change versus the same quarter last year. Official report ↗

According to Avio, revenue for the first nine months of 2026 reached €409.7m, up 16.7% on a year earlier. Reported EBITDA rose 18% to €17.9m and full-year guidance was confirmed. The market shrugged. According to Reuters, the shares fell as much as 4.6% after the release before paring losses to trade flat, because the company did not raise its revenue forecast (in 2026 defence stocks, "guidance confirmed" has long been read as a disappointment).

I am watching a different number. The order backlog stands at €1,993m: 8% lower than at the end of 2025 and €7m below the bottom of Avio's own year-end guidance of €2,000–2,100m. Seven million is small change for a company with turnover above half a billion. The direction is the problem. The backlog has now shrunk for three quarters in a row.

What the report shows

Avio publishes cumulative figures, so the third quarter has to be worked out by hand: nine months minus the half year. The Q3 column is a SpaceCAPEX calculation.

Metric (€m)H1 20269M 2026Q3 2026*
Net revenue276.0409.7133.7
Reported EBITDA11.917.96.0
EBITDA margin4.3%4.4%4.5%
Adjusted EBITDA12.218.66.4
Reported EBIT1.21.70.5
Order backlog (end of period)2,0481,993−55
Net financial position (end of period)535.7614.5+78.8

* 9M minus H1, SpaceCAPEX calculation; for backlog and net financial position, the change over the quarter.

Third-quarter revenue came to €133.7m, 9.4% below Q2 (€147.5m) and slightly above the first quarter (€128.5m). I would not make much of the dip. Avio recognises revenue on contract progress, and August is when Italian factory lines stop for the holidays; anyone who has planned production in southern Europe knows the third quarter always looks a month short. Nine-month growth came from faster Vega C production, more Ariane 6 engine deliveries and defence propulsion.

The margin line is more telling. Q3 EBITDA was €6.0m, or 4.5% of revenue, slightly better than 4.3% for the half year. Out of every euro of rockets and motors sold, Avio keeps about 4.5 cents before depreciation. EBIT for the three months was half a million euros on turnover of €134m, which is as near to zero as makes no difference (on a factory floor this is called "working for the wages").

Part of the explanation lies in America, which costs money before it makes any. According to the nine-month slides, Avio USA's operating costs will be €7–9m in 2026 and are built into the EBITDA guidance. On the analyst call, chief financial officer Roberto Carassai said "almost 5 million" had been spent by the end of September (the transcript's headline claims 70% revenue growth, which is wrong; the release says 16.7%). Strip out those five million and the nine-month margin would be about 5.6% instead of 4.4%. The US project is eating close to a fifth of the group's operating profit, years before it has cast a single motor.

The plant in Hurt, Virginia, broke ground on 29 September, and this is where it gets interesting for someone from manufacturing. Baseline capacity is 700 tonnes of propellant a year, expandable to 2,100 tonnes with extra mixers, and each additional mixer costs "a few tens of millions of dollars", according to chief executive Giulio Ranzo. The decision on how big to build has been pushed to 2027. That is the right order: customer first, machines second. On 13 October Lockheed Martin signed an agreement for ER GMLRS and PrSM motors, reserving part of the capacity of a plant that for now is mud and rebar. Raytheon is "in the making", and Ranzo hopes to sign by the end of the year. Capacity sold before it is built is what everyone who has defended a capex case to a board dreams of. The catch is in two words of Lockheed's announcement: "following qualification". Qualifying a solid rocket motor for a US missile means a series of static fire tests, not a signature, and no value has been disclosed for the agreement.

Guidance

The 2026 guidance was confirmed unchanged. The arithmetic that, to my mind, decides the year has three lines.

Q2 and Q3 are derived from the cumulative reports. To reach €560–590m for the year, Q4 needs €150.3–180.3m, less than Q4 2025.Source: Avio; SpaceCAPEX calculations

Revenue is the easy one. To reach €560m Avio needs €150.3m in Q4; to reach €590m, €180.3m. Both figures are below Q4 2025, which according to the annual results was €190.7m (541.7 minus 351.0). The revenue guidance is conservative, and Ranzo makes no secret that he is aiming for its upper half.

EBITDA is harder. The bottom of the range (€27m) requires €9.1m in Q4; the top (€35m) requires €17.1m. That is between 1.5 and 2.9 times Q3, at a margin of 6.1% to 9.5%. Ranzo says about half of the year's profit lands in the final quarter. I believe him on the bottom end. The top end needs a quarter of a kind Avio has not shown this year.

Orders are the most awkward. Year-end backlog is roughly today's figure plus new orders minus Q4 revenue (over nine months that sum gives €1,993.3m against the reported €1,993m, so it holds). With Q4 revenue around the middle of guidance, €165m, Avio needs to sign at least about €172m of new orders to reach €2,000m, and about €272m to reach €2,100m. The whole of the third quarter brought in about €79m (again a calculation: about €237m for nine months minus about €158m for the half year).

The backlog has shrunk for three quarters running. At 30 September it sat €7m below the bottom of the year-end guidance.Source: Avio

What to watch

Orders first. Part of the way has been covered: on 28 October MBDA placed an order worth more than €55m for ASTER 30 motors and aerodynamic surfaces. Ranzo expects the rest mainly from space, from launch service contracts and ESA orders. If they do not arrive by 31 December, Avio will miss its own guidance on precisely the metric that underpins the whole investment case.

Then cash. The net financial position stands at €614.5m, €22.8m higher than at the end of 2025. That sounds healthy until you notice that it includes €109.4m from the reserved capital increase for Advent, completed on 24 September at €33.40 a share. Excluding Advent, the position fell by €86.6m over nine months (including a €6.8m dividend), and by €30.6m in Q3 alone. Avio attributes this to investment and to customer advances gradually flowing down to suppliers. For a heavy capex phase that is normal. It just needs saying plainly: right now the till is being filled by shareholders, not by operations.

What comes next

VV30 lifted off on the evening of 14 September Kourou time (03:21 CEST on the 15th) carrying Sentinel-3C and FLEX, the second Vega C flight with Avio as operator. On 27 August Arianespace launched MTG-I2 on an Ariane 62, for which Avio supplies the boosters and turbopumps. On the call Ranzo promised a third Vega C flight this year "before Christmas", carrying six satellites (it is the customers' spacecraft that are late, not the rocket), and four flights in 2027. Ariane 6 booster deliveries are up 50% this year and set to rise another 50% next year, to about 90% of capacity. That is a production schedule rather than a 2030 vision, which is why I trust it more than anything else in the deck.

The next report, for full-year 2026, is expected in March 2027 (the date is not yet in Avio's calendar). What will matter then is whether the backlog is above €2,000m and whether Q4 delivered a margin above 6%. For now the report is good on revenue and weak on everything that comes after it: Avio is producing more than it is signing, and paying for its American bet with Advent's money. I will be tracking it on the Avio profile.

This article is for information only and is not investment advice.

Newsletter
The money behind space, once a month

The finance, deals and business behind the launches — with numbers and data you won't find elsewhere. Once a month, no spam.

I write about the money behind space, with data you won't find elsewhere. — Stanislav Milchev